STEP 1
Receive the assigned job
MM
A.Linesman
DGI Gang 01 · Linesman field app
My Assigned Work
ZG-1842 · Re-insulation
PWR-001 · PO-4YZ-2026-001 · Top Arm · Low Numbers · 4YZ
Ready
PWR-001 · PO-4YZ-2026-001 · Top Arm · Low Numbers · 4YZ
Ready
Re-insulation Job Pack
All mandatory information must be completed before the job can be submitted.
Completion Evidence
Every real photo is tagged at capture: project, PO, tower, circuit/position, operative, original timestamp, GPS/geofence verification and unique evidence ID. The untouched original is retained separately from any annotated review copy.
01 · Tower-End FixingLanding pin + split pin
DEMO PHOTO
02 · Full Insulator StringComplete string + unit count
DEMO PHOTO
03 · Bottom Plate / Bolt OrientationDirection documented on image
DEMO PHOTO
04 · Damper Measurement1.60 m shoe-centre → damper-centre
DEMO PHOTO
Final Completion Checks
All pins / split pins / retaining devices checked
Insulator unit count confirmed
Bottom plate / bolt orientation confirmed
Torque verified to approved work instruction; tool / calibration recorded
Damper position measured and confirmed
Final installation overview captured
If offline, the job remains securely queued and uploads automatically when connection returns.
✓
Job Submitted
The completed job has gone back to DGI for supervisor review.
End of Linesman Demo
Work accepted
Mandatory job data completed
Evidence captured with provenance
Completed job submitted once